6 min read
Barómetro do Achismo · 17th edition · meeting of 05/11/2026
Last week's verdict
We asked: "In Greater Lisbon, at median prices, which would you choose?"
94.4% chose to buy.
- Buy a 65 m² two-bedroom flat for €262,000: 50.0%
- Buy a 90 m² two-bedroom flat for €363,000: 44.4%
- Rent a 65 m² two-bedroom flat for €990/month: 5.6%
- Rent a 90 m² two-bedroom flat for €1,370/month: 0.0%
By choice or for lack of an alternative? In our view, for lack of an alternative: the culture is one of buying and there is almost no rental supply. Sample of no statistical relevance.
This week's achismo: "Once the project is approved, the hard part is done."
Two numbers side by side. In 2025, 48,844 homes received planning consent in Portugal, the highest figure since 2011. In the same year, 30,425 were completed (INE, the national statistics institute). They are not the same homes, because a build takes years. But the gap says a lot.
When André asked on LinkedIn why an approved project does not leave the drawing board, 39% pointed to numbers that no longer add up and another 39% to lack of financing. Product and construction got 10% each.
The team does not entirely agree. André talks about the build, where deadlines are ever harder to hold. Gonçalo, about the product. Miguel, about the bank. João, about the brief handed to the architect.
André Casaca
In Lisbon, we obtained consent for extending a building through a qualified PIP (pre-application request) in about 5 months. That was fast. What delayed the start of works was something else: negotiating and awarding the construction contract.
Planning consent has statutory deadlines, and the new RJUE (the legal regime for urban development and building) has even shortened them. In practice, we'll see. In our business plans we still allow 3 to 9 months for a PIP and 12 to 18 for full consent. And time is still lost where it shouldn't be: preparing the submission, when a meeting with the council's officers takes one to two months.
On site, deadlines are ever harder to hold. To start and to finish. Under prior notification (comunicação prévia), we count 3 to 5 months just to get going. After that, the problems are almost always the same: missing crews, bids closed on minimal margins, the hunt for variations, and costs that rise while deadlines slip.
Anyone who thinks the hard part ends with planning consent has not yet had to deliver a build on time.
André's sentiment: "After consent, the hardest part is delivering the build. Selling is easy: you just need the right price."
Gonçalo Miguel
Having an approved project is undoubtedly an advantage. But it is far from meaning the deal is done or that the hardest part is over. In our work, we are often approached by owners and intermediaries presenting land and buildings with supposedly approved projects, often at heavily inflated prices.
The problem is that, all too often, when we dig deeper, we find the project is not actually approved or that, even if it is, it does not match real demand in that location. Whether because of ill-suited unit types, uncompetitive floor areas or expected sale prices the market simply will not absorb, among other constraints. And that is the difference between having a project on paper and having a genuine real estate product, commercially viable and genuinely able to proceed to construction.
An approved project reduces uncertainty and can shorten the road, but it does not eliminate development risk, does not guarantee financing, does not secure construction and, above all, does not guarantee demand for what is to be built. In the end, what determines a project's value is not just what has been approved, but its ability to produce a product that fits the market, that is genuinely viable, built and sold.
Gonçalo's sentiment: "An approved project is not necessarily a good deal. The real value lies in its viability and its ability to meet real market demand."
Miguel Amaral, AssocRICS
According to Confidencial Imobiliário, between 2019 and 2023, 41% of planned housing never became supply, while in 2024–2025 the figure was 36%.
It is hard to say with certainty what the main reason for this gap is but slow planning consent, difficulties in carrying out projects and financing complications are surely among the main ones.
Taking the last point, the truth is that approving a project does not mean the financial conditions exist to proceed with construction. Many investments do stall at this stage, a reality that can perhaps be explained as follows:
- Equity: Banks require the developer to fund a significant part of the investment, often between 30% and 40%, depending on the deal.
- Pre-sales: Some banks require a minimum percentage of units sold before releasing finance.
- Construction costs: Rising costs can undermine the originally expected return.
- Bank guarantees: Guarantees, proof of financial capacity and safety margins are required.
- Staged financing: The bank releases money as the works progress, so the developer must have liquidity to carry the build.
In Portugal we do not just need to approve projects faster; we need to make sure approved projects are technically and financially deliverable!
Miguel's sentiment: "Success should not be measured by the number of projects approved, but by the number of homes actually built."
Architect João Franco, the grumpy guest
It is true that most approved projects do not go ahead. It is also true that planning consent is what takes risk out of a deal, and that the design sets the developer's profit even before works begin.
So why the discrepancy?
I think it comes from two factors. The first is the brief given to the architect, which is not adapted to the market. If we obtain consent for something whose numbers do not add up, consent will not fix it.
The second is the expectations of architect and developer. We all want to build big and well. Architects want more interesting projects, and that usually comes at a price. Developers want to be in line with market expectations, which may not be compatible with the price we want the homes to sell at.
João's sentiment: "Planning consent matters, but it is in defining the brief that you decide whether what is 'consented' is sellable."
The Laplace reading
Four voices, one point in common: approval is the beginning, not the end.
Gonçalo and João point to the product. Miguel, to the bank. André, to the build: deadlines are ever harder to hold, to start and to finish.
And one open disagreement: André says selling is easy, you just need the right price. Gonçalo reminds us that price has to fit the market.
Consent takes risk out of the project. Not out of the deal.
This edition's question: after consent, what is hardest?
- A · Closing the financing
- B · Hiring the contractor
- C · Delivering the build on time and on budget
- D · Selling the homes
No filters. No polished reports.
Do you have land or a building and want to know whether the numbers add up? Apply for a potential analysis.
Get Sentimento de Mercado every Monday by email: subscribe.
Sources: INE, Construction and Housing Statistics 2025 (48,844 homes consented and 30,425 completed in 2025, estimate); Confidencial Imobiliário, cited by Miguel Amaral. Poll from the 16th edition and LinkedIn polls by André Casaca: non-representative samples, of no statistical relevance. Market information; not investment advice. Asking ≠ transaction.
Frequently asked questions
If a project is already approved, does that mean construction will go ahead?
Not necessarily. In 2025, 48,844 homes received planning consent and only 30,425 were completed: approval is only the beginning. Financing, awarding the construction contract and making sure the product meets real demand all still lie ahead.
Why are so many approved projects never built?
The reasons split between numbers that no longer add up, lack of financing, product problems and difficulties on site. A project can be approved and still have ill-suited unit types, uncompetitive floor areas or prices the market will not absorb.
What do banks require to finance construction after planning consent?
Banks usually require the developer to fund 30% to 40% of the investment as equity, plus, in some cases, a minimum level of pre-sales. They also require bank guarantees and proof of financial capacity, and they release finance in stages as the works progress.
How long does planning consent usually take in Portugal?
In the Laplace team's experience, a PIP (pre-application request) usually takes 3 to 9 months and full planning consent 12 to 18 months. Even after approval, another 3 to 5 months may pass before works start.
What really decides whether an approved project is a good deal?
Approval on paper is not enough: there has to be real demand for that unit type, location and price. The real value lies in the project's ability to become a viable real estate product — financeable, built and actually sold.
Um abraço e até breve
Laplace

